Third-Party and AHJ Review

Field Change Conflict Resolution

Poole Fire Protection understands both the performance-based and prescriptive code criteria associated with fire protection systems and their related equipment. Our team of specialists will facilitate field changes and resolve fire protection and life safety code issues that often arise during construction. These resolutions can be identified during a pre-inspection walk through or during resolution meetings with the Authority Having Jurisdiction.

Third Party Plan Review and AHJ Coordination

Poole Fire Protection’s expertise is recognized by building and fire code authorities throughout the United States. Our third-party reviews include compliance assessment of prepared plans and drawings, potential alternatives and performance-based designs. This comprehensive, objective approach assists clients when changes must be coordinated with the Authority Having Jurisdiction.

Commercial & Industrial Project ConocoPhillips Petroleum Since 1998, Poole Fire Protection has served as the primary fire protection consultant for the ConocoPhillips Petroleum Company's seven-building campus located in Bartlesville, OK.

Read More

KUAllen Fieldhouse & Memorial Stadium The university requested that Poole Fire Protection draft the drawings and specifications needed for the automatic sprinkler and standpipe system, fire pump system, and fire alarm system.

Read More

AviationWill Rogers World Airport Maintenance Hangar The new Aircraft Maintenance Hangar and Training and standardization Complex will be constructed at the Will Rogers World Airport, Oklahoma City, OK.

Read More

Western AutoWestern Auto Renovation Poole Fire Protection designed the fire sprinkler system and provided construction management during the system’s installation as part of the Western Auto Building’s renovation into loft apartments.

Read More